

At about ten cm from the bottom of the tub, drill a hole in the 40mm pipe and the side of the bathtub, and run a tube to the outside for an overflow. (If it rains heavily, you don't want the tub filling with water.) We placed some tile roof capping over the top of the gravel, but it's not really necessary.

No comments:
Post a Comment